PV PRESSURE / VACUUM TEST BENCH OPEREATION MANUAL
A-) MAINTENANCE PROCEDURE: Bench to be kept clean in a dehumidified place when out of test operation B-) PREPARING AMBIANCE FOR TEST -Keep the test bench and PV Valve test foundation near a service air supply valve. -Service air(in engine room or on the deck) can be used for test bench -Test air must be dry and dehumidified condition. Therefore if air system does not have this specification.please drain the line for enough time. -Please take care all valves are closed position before supplying air to the system.also be sure to connect to the consol of the PV Valve safely. -Test bench have two different discharge lines, one of them for pressure ,other one for vacuum test control connection hoses can be connected easily with the quick coupling.
C-) TEST OPERATIONS -Open the air supply valve.
-Adjust the pressure regulator valve (4bar/59 psi value is preferable) -Open the pressure regulator valve gradually and check the scale of the gauge at the opening time of the head of the pressure side
-You can check several
times -After testing,close both of the valves. -Change the connection hose from discharge of pressure side to discharge of vacuum side -Open the air supply valve . -Open the vacuum ejecter valve and be sure working of the ejecter nozzle which is in the box. -Then open the vacuum regulator valve gradually and check the scale of the gauge at the moving of the vacuum weight spindle. -After testing close all the valves. Contact - İletişim Contact Name: Mr. Gunes ERDEMI Tel: +9 0 536 436 89 53
|
Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn Ship Horn